PulJak PulJak Replacement Parts

Item # PUL-JAK-PARTS
PulJak PulJak Replacement Parts
Actual product(s) may vary from pictures shown
Sku Model Price Quantity
P-105 Handle Bar $12.94
P-107 Puller Pin (Type A) $2.37
P-108 Clevis Pin - 3/8" $2.37
P-109 Clevis Pin - 1/4" $2.37
P-110 Cotter Pin $2.37
P-111 Bow 72 Locking Cotter $2.37
P-116 Toggle (Type B) $60.96
P-121 Hex Bolt (Type B) $2.45

Details

Details

Pul Jak Replacement Parts

P-122 - The Pul Jak Rebuild kit allows you to refurbish the Pul-Jak workhead if parts break or become loose.

Instructions

Instructions

P-122 - Instructions for Rebuilding Your Pul Jak:

  1. Remove Pul Jak rod and handle casting from workhead. Remove old cams and springs.
  2. Compress new springs on each side with pliers and wrap with 10 turns of Scotch tape to securely hold in compressed position.
  3. Place new cams & springs in cavity. Break Scotch tape with screwdriver pushed through the rod hole. Make certain that springs are seated properly and centered in recess.
  4. Insert Pul Jak rod from each end to test for alignment of all internal parts. Both cams should move smoothly against spring.
  5. Reassemble handle casting with notch over ear of cam.
  6. File off heavy ridges on rod and replace in Pul Jak.

Reviews

Reviews

There are no reviews yet. Be the first to Write a Review (requires login).

Shipping

Shipping

Shipping Expense Disclaimer: All orders are subject to confirmation. Additional shipping expenses, although rare, may apply due to weight, size, location, and/or other variables. Should your order require additional funds to cover the transportation of goods, you will be contacted prior to order processing for approval.
Parts for this product
Accepted Payment Methods
Authorize.net Verified Merchant Secured by GeoTrust Better Business Bureau Accredited Business Member of the American Fence Association, Inc. Certified Fence Professional Certified Automated Gate Operator Installer Certified Automated Gate Systems Designer